.

Preferred Configurations

Public feedback and direction from the Ministry of Highways led to two bridge concepts:

Concept One: A steel plate girder bridge with a concrete deck, similar to the Chief Mistawasis Bridge

11_River_Crosiing_StealGrdr_01_20211208
11_River_Crosiing_StealGrdr_02_20211208

.

Concept Two: An asymmetrical cable-stayed bridge with a concrete deck

11_Rver_Crossing_CblStay_01_20211208
11_Rver_Crossing_CblStay_02_20211208

You can find details here on the evaluation process that led to two bridge concepts. 

The functional planning study is carrying forward both bridge types. A final decision on the bridge concept will be made through a competitive bidding process once a decision has been made to proceed with construction of the Saskatoon Freeway. 

Tell us what you think

Sign-up for Updates

Subscribe to get the latest news on our work.

Skip to content